Join Us!
Instructions Check project status here. Login to view private project updates. (If this is your first time here, please register and we will grant permission to access any private reports.)
 Search by Project 

  
Keyword Search


Login to view a complete list of Reports posted for you.
view by pages
Kensington Expressway
Brief: Kensington Expressway, Boulevard Option
In 1958, the year the Kensington Expressway opened, the beautiful and desirable neighborhoods it plowed through were instantly blighted, most noticeab ...
»»more
 
Tear it down! Lessons from San Francisco
In 1989, an earthquake struck the San Francisco Bay Area which severely damaged many of its elevated highway structure ...
»»more
 
Undoing Big Mistakes: Lessons from Portland
In Oregon, a battle raged for nearly twenty years over the construction of a highway project known as the Mt. Hood Freeway. If approved, the Freeway w ...
»»more
 
SmartCode
Buffalo Code-Reform Committee
Items pertaining to the AIA Buffalo Urban Design Committee (UDC) code-reform project (attended by representatives from AIA, City of Buffalo OSP, NMG,  ...
»»more
 
Articles, Presentations, & Case Studies
Articles, presentations, and case studies relating to the NMG SmartCode Project. ...
»»more
 
SmartCode v.9.2 + Modules
This is the entire SmartCode & Manual, version 9.2. The base SmartCode is shorter and simpler than Version 8. Sections that were rarely used have been ...
»»more
 
Buffalo SmartCode Conference: Video & Docs
This project contains information about NMG's SmartCode Conference, including videos, a summary sheet, fact sheet, FAQ, and sample code. Also, you may ...
»»more
 
SmartCode Workshop Trip (Mar 2006, Biloxi, MS)
Information about the SmartCode Workshop, March 2006, in Biloxi, MS. ...
»»more
 
SmartCode v.8 + Manual
This is the entire SmartCode & Manual, version 8. The document is downloadable in sections. (To download all at once, click 'Check all' and then click ...
»»more
 
Buffalo's Waterfront
NMG's Outer Harbor Vision
Our vision is to creat a compact, walkable urban village, adjacent to a linear park system with access for all.

This form of development has create ...
»»more
 
Peace Bridge & International Gateway Project
Christian Menn's Curved Cable-Stayed Bridge
Dr. Christian Menn has unveiled his concept for a world-class signature bridge to connect the two great nations of Canada and the United States.

M ...
»»more
 
Northern Gateway Press Release
Direct connections to Niagara Street, a fully restored Ft. Porter and Olmsted's Front Park, and removal of thruway on/off ramps from Porter Avenue are ...
»»more
 
Northern Gateway Vision
For this project to have any value for Buffalo, it needs to be a catalyst for rising property values. It can do no harm and it must do good.

A Gate ...
»»more
 
Curved Signature Bridge and Shared Border
Shared Border Management was a breakthrough. It could enable Peace Bridge capacity expansion while at the same time improving the Peace Bridge neighbo ...
»»more
 
Measure Twice. Cut Once.
The Bluewater Bridge in Port Huron is similar to the Peace Bridge. In the late 90's a twinspan was constructed -- ostensibly to relieve the backups. T ...
»»more
 
Why we need a Signature Bridge
NMG crusaded against a steel twinspan. Our rationale was both aesthetic and pragmatic. The International Gateway is most valuable as a tourism gateway ...
»»more
 
Hedlund: Front Park & Porter Ave. Restoration
Peter Hedlund developed a rationale and plan for restoring all of Front Park, Fort Porter and Porter Avenue in his inspiring Master's Thesis in August ...
»»more
 
Better, Faster, Cheaper -- 2
This is part 2 of the New Millennium Group presentation summarizing why we know that a better Peace Bridge expansion project is not only "doable& ...
»»more
 
Better, Faster, Cheaper -- 1
The New Millennium Group prompted the creation of the Public Consensus Review Process that was funded by Erie County, the City of Buffalo, the Margare ...
»»more
 
What We Want -- June 29, 2001
For years the Public Bridge Authority has held public meetings where we have felt ultimately ignored. Time and again they ask us "what do you wan ...
»»more
 
Downtown Buffalo Casino
NMG's Positon on Casino Gambling
NMG's opposition to a casino in Downtown Buffalo is based on many of the same concerns, as reported in the News, expressed by members of the Buffalo P ...
»»more
 
Scajaquada Corridor Project
NMG Scajaquada Corridor Vision
This Vision was first presented to the DOT and the community coalition in October 2002. Since then, most of the concepts in this document have been ad ...
»»more
 
Final Report & Proposal (June 2005)
The City of Buffalo has prepared this Expanded Project Proposal to document a study that identifies feasible highway alternatives, streetscape and tra ...
»»more
 
Coalition Group Meetings (Fall 2005)
Several meetings have been held to review the status of the Scajaquada Corridor Project, including representatives from DOT, GBNRTC, The Buffalo Olmst ...
»»more
 
Public Information Meeting (02 October 2003)
The presentation at this meeting was the end-result of the design charrette conducted the previous summer, and notably included many ideas from NMG's  ...
»»more
 
Scajaquada & Delaware Park: 1927 to 1995
As a research tool for restoration of Delaware Park and Scajaquada Parkway, NMG constructed a superimposition of aerial surveys from years 1927 & 1995 ...
»»more
 
Walk Buffalo
Information & Online Tour
Walk Buffalo is a wonderful way for both visitors and native Western New Yorkers of all backgrounds to learn about the rich history and architecture t ...
»»more
 
Park Buffalo
'Park Buffalo' Map & Press Release
In July 2003, members of the TAG organized a sartorial send-up entitled 'Park Buffalo' to focus public attention on the massive physical, social, and  ...
»»more
 
view by pages

Home   |   Action Groups   |   Membership   |   News & Events   |   Links   |   Contact   |   Join Us
   Powered by ACEN